What a depot invoices, line by line
Gate-in and gate-out. Every movement across the gate is an event, and each event is charged. The names vary — lift on, lift off, handling in, handling out — but the substance is a crane or reach stacker moving a box and a clerk recording it. Two movements minimum per stay, one at each end.
Storage, per day, per unit. The line everyone compares. It starts when the unit is gated in and stops when it is gated out, and it does not care whether the box is full, empty, sold or waiting for a decision.
Survey. An inspection against a standard — usually IICL criteria or a cargo-worthy assessment. Charged per unit, and it is what produces the condition record everything else is argued against.
Cleaning. Sweeping, washing, odour treatment, or removal of a previous cargo's residue. Quoted per unit and sometimes per problem.
Repair. An estimate first, then the work if it is approved. The estimate itself is often chargeable, and the approval step is where days go missing while storage keeps running.
Reefer-specific. Pre-trip inspection, plugging in, monitoring, and power. A reefer sitting in a yard consumes electricity, and someone is billed for it.























