海运集装箱交付指南 | MG-Atlantic

海运集装箱交付流程详解:卡车类型、场地通行与净空要求、卸载方式以及典型交货周期,帮助您顺利完成准时高效的集装箱交付安排。

Truck access requirements, tilt-bed vs crane offload, common delivery issues and a pre-delivery site checklist for US container buyers.

Delivery Workflow

Order confirmation, site qualification, depot release, trucker dispatch, delivery window, drop and walk. A 3–10 business day cycle when access is confirmed up front.

Truck Access Requirements

100 ft of straight pull-back, 12 ft path width, 14 ft vertical clearance and an 8% maximum slope for a 40ft tilt-bed delivery.

Unloading Methods

Tilt-bed ($400–$900) for flat ground placement; HIAB boom truck ($750–$2,500) for foundations or side placement; dedicated mobile crane ($1,200–$5,000) for raised pads or stacking.

Common Issues

Low overhead wires, soft ground, tight driveway entries, slopes over 8%, wrong door orientation and no one on-site — each costs a failed-delivery fee of $400 or more.